• Bottcher, J., Drexl, A., Kolisch, R., Salewski, F. (1996). “Project Scheduling Under Partially Renewable Resource Constraints”. Technicl report 398 Manuscipte aus den Instituten fur Betriebswritschaftslehre der Universitat Kiel.

 

  • Talbot, F.B (1982). “Resource-Constrined Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case”. Management Science, 38: pp. 1498-1509.

 

  • Pritsker, A. B., Watters, L. J. and Wolfe, P. M., Multiproject scheduling with limited resources: A zero-one programming approach. Management Science, 1969, 16, 93-108.

 

  • Patterson, J. H. and Roth, G., Scheduling a project under multiple resource constraints: A zero-oneprogramming approach. AIIE Transactions, 1976, 8, 449-456.

 

  • Carruthers, J. A. and Battersby, A., Advances in critical path methods. Opertional Research Quarterly, 1966, 17, 359-380.

 

  • Petrovic, R., Optimisation of resource allocation in project planning. Operations Research, 1986, 16, 559-586.

 

  • Demeulemeester, E. and Herroelen, W., New benchmark results for the resource-constrained project scheduling problem. Management Science, 1997, 43, 1485-1492.

 

  • Brucker, P., Schoo, A. nd Thiele, O., A branch-and-bound algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 1998, to appear.

 

  • Dorndorf, U., Pesch, E., Phan-Huy, T. A branch-and-bound algorithm for the resource-constrained project scheduling problem, Mathematical Methods of Operations Research 52(2000) 413-439.

 

  • Sprecher, A. , Drexl, A. (1995). Semi-Active, Active and non-delay Schedules for the Resource Constrained Project Scheduling Poblem, European Journal of Operational Research 80, 94-102.

 

  • Kolisch, R. (1996). Series and Parallel Resource Constrained Project Scheduling Method Revisited: Theory and Computation, European Jounal Of Operational Research 90,320-333.

 

  • Lee, J.K. and Y.D. Kim (1996), Search Heuristics for Resource Constrained Project Scheduling, Jounal of the Operational Research Society, 47, 678-689.

 

  • Kohlmorgen, U., H. Schmeck and K. Haase (1999), Experiences with Fine-Gained Parallel Genetic Algorithms, Annals of Opertions Reseach, 90, 203-219.

 

  • S. Hartmann, A competitive genetic algorithm for resource-constrained poject scheduling, Naval Research Logistics 49 (2002) 433-448.

 

  • J. Alcaraz, C. Maroto, A robust genetic algorithm for resource allocation in poject scheduling, Annals of Operations Research 102 (2001) 83-109.

 

  • S. Hartmann, A self-adapting genetic algorithm for project scheduling under resource constraints, Naval Research Logistics 49 (2002) 433-448.

 

  • Y.C. Toklu, Appliction of genetic algorithm to construction scheduling with o without resouce constraints, Candian Journal of Civil Engineeing 29 (2002) 421-429.

 

  • K.S. Hindi, H. Yang, K. Fleszar, An evolutionary algorithm for resource-constrained project scheduling, IEEE Transaction on Evolutionary Computation 6 (2002) 512-518.

 

  • J. Coelho, L. Tavares, Comparative analysis of metaheuicstics for the resource constrained project scheduling problem, Technical, report, Depertmant of Civil Engineering, Instituto Superior Tecnico, Portugal.

 

  • J. Gonclves, J. Mendes, A random key based genetic algorithm for the resource-constained poject scheduling problem. Technical report, Depatamento de Engenharia Universidade do Porto, 2003.

 

  • Goncalves JF, Beirao NC. Um algoritmo genetic baseado em chaves aleatorias para sequenciamento de operacoes. Revista Associacao Portuguesa Investigacao Opeacional 1999;19:123-37 (in Portuguese).

 

  • Mendes. J.J.M, Goncalves. J.F, Resende. M.G.C. A random key based genetic algorithm for the resource constrained project scheduling problem. Computers and Operations Research 36 (2009) 92-109.

 

  • P.R. Thomas, S. Salhi, A tabu search approach for the resource constrained project scheduling problem, Journal of Heuristics 4 (1998) 123-139.

 

  • T. Baar, P. Brucker, S. Knust, Tabu-search algorithm and lower bounds for the resource-constrained project scheduling problem, in: S. Voss, S. Martello, I. Osman, C. Roucairolb (Eds), Meta-heuristics: Advances and Trends in Local Search Paradigms for optimization, Kluwer Academic Publishers, Dordrecht, 1998, pp. 1-8.

 

  • R. Klein, Project scheduling with time-varying resource-constraints, International Journal of Production Research 38(16) (2000) 3937-3952.

 

  • K. Nonobe, T. Ibaraki, Formulation and tabu search algorithm for the resource constrained project scheduling problem, in: C.C. Ribeiro, P. Hansen (Eds.), Essays and Surveys in Metaheuristics, Kluwer Academic Publishers, 2002, pp. 557-588.

 

  • N. Pan, P. Wen Hsaio, K. Chen, A study of project scheduling optimization using Tabu Search algorithm, Engineering Applications of Artificial Intelligence 21 (2008) 1101-1112.

 

  • P. Tormos, A. Lova, A competitive heuristics solution technique for resource-constrained project scheduling, Annals of Operations Research 102 (2001) 65-81.

 

  • V. Valls, M.S. Quintailla, F. Ballestin, Resource-constrained project scheduling: A critical reordering heuristic, European Journal of Operational Research 149 (2003) 282-301.

 

  • V. Valls, F. Ballestin, M.S. Quintanilla, Justification and RCPSP: A technique that pays, European Journal of Operational Research 165 (2005) 375-386.

 

  • H. Zhang, X. Li, H. Li, F. Huang,”Particle swarm optimization-based schemes for resource-constrained project scheduling “, Automation in construction 14 (2005) 393-404.

 

  • R.M. Chen, C,L, Wu, C.M. Wang, Sh.T. Lo, “Using novel particle swarn optimization scheme to solve resource-constrained scheduling problem in PSPLIB “, Expert Systems with Applications, Volume 37. Issue 3, 15 March, 2010, pp. 1899-1910.

 

  • A. Ahmadi-Javid, P. Hooshangi-Tabrizi, An Anarchic Society Optimization Algorithm for a Flow-Shop Scheduling Problem with Multiple Transporters between Successive Machines, Proceedings of the 2012 International Conference Industrial Engineering and Operations Management Istanbul, Turkey, July 3-6, 2012.

 

  • Pritsker A. A.B., Watters, L. J., Wolfe, P. M., (1969). Multi project Scheduling with Limited Resources: A Zero-one Programming Approach, Management Science, 16, 93-108

 

  • Alvarez-Valdez, R. , Tamarit, J. M. , (1993). The Project Scheduling Polyhedron: Dimensions, Facts and Lifting Theorems European Jornal of Operational Research 67, 204-220

 

  • Mingozzi A. , Maniezzo, V. , Ricciardelli, S., and Bianco, L. (1998), An Exact Algorithm for Resource Constrained Project Scheduling Problem based on a new mathematical Formulation, Management Science, 44, 715-729.

 

  • J.Kennedy and R. Eberhart, “Particle swarn optimization”, Proceedings of the IEEE International Conference on Neural Networks (Perth, Australia) 1942-1948, 1995.

 

  • Kolisch, R. and A. Sprecher (1996), PSPLIB - A project scheduling library, European Journal of Operational Research,Vol. 96, pp. 205–216.

 

  • kolisch,R.,Sprecher,A.,Drexl,A,Charactrization and generation of a general class of resource-constrained project scheduling problems.Management science 41,pp.1693-1703.1995

 

[۴۳] Taguchi, G., 1986. Introduction to quality engineering. White Plains: Asian Productivity Organization/UNIPUB.
[۴۴] R. Kolisch und S. Hartmann (2006): Experimental Investigation of Heuristics for
Resource-Constrained Project Scheduling: An Update, European Journal of
Operational Research 174, 23-37, 2006.